(JP¥1,700)
+NT$386 Shipping fee
+NT$64 Agent service fee
Text are automatically translated.
Report translation issueText are automatically translated.
Report translation issueFraud prevention
Customer support
Refund support for customers
Seller info
na-chan*
5/5166
View detail
Item condition
Brand New
Ships from
Japan
Category
The examples of construction experience descriptions for sale were created based on the types and contents of the construction I have actually experienced. Compared to commercially available reference books, the content is almost entirely non-overlapping. I have passed the Grade 1 Piping Construction Management Engineering Examination based on the content of ① below. The specific details are as follows: Construction Content: Propane gas (LPG) piping work ① Safety Management: Accident prevention during oxygen deficiency hazardous work → For one item considered particularly important, Three measures or countermeasures taken Process Management: Changes to the work plan due to delays in the start date → For one item considered particularly important, Three measures or countermeasures taken Test Run Adjustment: Confirmation of the stability of the gas pressure to be supplied → For one item considered particularly important, Three measures or countermeasures taken Self-Inspection: Confirmation of the construction status before backfilling the buried piping → For one item considered particularly important, Three measures or countermeasures taken Acceptance Inspection: On-site acceptance inspection of various piping materials → Three inspection contents that were considered particularly important and implemented Construction Content: Liquefied gas supply piping work ② Safety Management: Preventing crane overturn during lifting operations Process Management: Process adjustment during outdoor pipe welding work Test Run Adjustment: Confirmation of the integrity of the flow rate monitoring system Self-Inspection: Confirmation of the maintainability of the completed supply equipment Acceptance Inspection: On-site acceptance inspection of evaporators and valves Construction Content: Septic tank installation work ③ Safety Management: Accident prevention due to the collapse of retaining walls Process Management: Consultation with construction personnel and process adjustment Test Run Adjustment: Confirmation of the noise level of the rotary blower Self-Inspection: Confirmation of drainage performance in inflow and outflow conduits Acceptance Inspection: On-site acceptance inspection of septic tanks and related items Specific information such as building names and addresses is blank (filled in with ●●●). The attached answer sheet is also enclosed, so please copy and use it. Upon purchase, 8 A4 sheets (the above 3 examples of experience descriptions + answer sheet) will be placed in a clear file and shipped in an envelope. Please refrain from price negotiations m(_ _)m #Grade 1 Piping Construction Management Engineer #Grade 1 Piping #Piping Construction #Construction Management #2nd Stage #Practical #Written #Description
1 year ago