(JP¥1,700)
+NT$386 Shipping fee
+NT$64 Agent service fee
Text are automatically translated.
Report translation issueText are automatically translated.
Report translation issueFraud prevention
Customer support
Refund support for customers
Seller info
na-chan*
5/5166
View detail
Item condition
Brand New
Ships from
Japan
Category
The examples of construction experience descriptions for sale were created based on the types and contents of the construction I have actually experienced. Compared to commercially available reference books, the content is almost entirely unique. I have passed the Grade 1 Electrical Construction Work Management Engineering Examination based on the content of ① below. The specific details are as follows: Construction Content: Electrical Instrumentation Work ① Fall Accidents: Preventing workers from falling during cable rack installation → 2 countermeasures for 1 reason Flying/Falling Objects: Preventing flying/falling of suspended loads during hoisting work → 2 countermeasures for 1 reason Electric Shock Accidents: Preventing workers from electric shock during work inside panels → 1 countermeasure (3 items) for 1 reason Process Management: Preventing delays in our own processes due to delays in previous processes → 2 countermeasures for 1 reason Preventing waiting periods due to lack of materials → 2 countermeasures for 1 reason Quality Control: Preventing malfunctions during operation of instrumentation equipment → 1 countermeasure (3 items) for 1 reason Construction Content: Explosion-proof Lighting Equipment Work ② Fall Accidents: Preventing workers from falling during lighting fixture installation Flying/Falling Objects: Preventing flying/falling of tools during lighting fixture assembly Electric Shock Accidents: Preventing workers from electric shock when using power tools Process Management: Preventing delays in the process due to delays in the delivery of lighting fixtures Preventing reduced efficiency during material delivery and waste disposal Quality Control: Preventing accidents due to poor performance of lighting fixtures Construction Content: Emergency Generator Equipment Work ③ Fall Accidents: Preventing pedestrians from falling during wiring in the underground pit Flying/Falling Objects: Preventing flying/falling of welding sparks during welding Electric Shock Accidents: Preventing workers from electric shock during welding of steel frames Process Management: Preventing delays in the process due to a shortage of workers Preventing delays in the process due to competing work with other construction Quality Control: Preventing malfunctions during operation of power generation equipment Specific information such as building names and addresses is left blank (fill in ●●●). The attached answer sheet photos are also included, so please copy and use them. Upon purchase, 12 A4 sheets (the above 3 examples of experience descriptions + answer sheets) will be placed in a clear file and shipped in an envelope. Please refrain from price negotiations m(_ _)m #Grade 1 Electrical Construction Work Management Engineer #Grade 1 Electrical #Electrical Construction #Construction Management #2nd Stage #Practical #Written #Description
4 months ago