(JP¥3,200)
+NT$379 Shipping fee
+NT$66 Service fee
Text is automatically translated.
Report translation issueText is automatically translated.
Report translation issueSeller info
ぴよこ
5/54227
View detail
Item condition
No noticeable scratches or marks
Ships from
Japan
Category
“Yamagata Shinkansen E8 Series Tsubasa 4K Filming: Shinjo - Fukushima” Price: ¥6000 *Slight scratches on the disc surface, not affecting playback. ◾︎Product Overview◾︎ The E8 series Tsubasa, connecting the future of the Yamagata Shinkansen, travels the Ou Main Line, a conventional line! The E8 series is a Shinkansen train car introduced by JR East in 2024. It will be operated on the Tohoku and Yamagata Shinkansen lines, succeeding the E3 series. The Yamagata Shinkansen connects Tokyo to Yamagata and Shinjo. It is known by the train name "Tsubasa" and mainly operates by splitting and combining with the Tohoku Shinkansen "Yamabiko" at Fukushima. Tokyo to Fukushima is a Shinkansen section, and Fukushima to Yamagata/Shinjo runs on the Ou Main Line, a conventional line, allowing direct operation between the Shinkansen and conventional lines. This work was recorded on an upward train departing from Shinjo. After departing Shinjo, the E8 series heads south on the Ou Main Line, with the Rikuu East Line running alongside. From here to Fukushima, the section has been converted to standard gauge to allow Shinkansen trains to run. The maximum speed is 130 km/h. Crossing bridges over the Mogami River system many times and passing many stations, it proceeds through the spring rural scenery with cherry blossoms in bloom. As it approaches Yamagata, it merges with the Senzan Line at Uzen-Chitose and the Aterazawa Line at Kitayama. You can compare the rail width with the narrow-gauge Ou Main Line on the right. Combining single-track and double-track sections, it runs swiftly through the basins of Yamagata and Yonezawa, then enters the mountains, challenging the steep Itaya Pass. Climbing the pass where remnants of snow remain, it passes the closed station of Osawa with ease, crosses the prefectural border, and goes through a series of tunnels. The scenery gradually shifts to an urban area, and the final sprint begins. At Fukushima, the final destination of this work, the arriving E5 series "Yamabiko" is waiting to connect with the E8 series "Tsubasa." ■Filming Date April 24, 2025, Cloudy then Sunny ■Filming Train 144M Tsubasa No. 144 E8 series G4 formation ←Shinjo E821-4 + E829-4 + E827-4 + E825-104 + E825-4 + E828-4 + E811-4 Fukushima→ *Due to operational reasons, "Tsubasa" No. 144 has been changed to be operated by the E8 series instead of the original E3 series. *Many other items are also available. Click here to see them all → #piyoko222 *Depending on the product, it can be changed to Mercari delivery. Please let me know before purchasing. #Books #ReferenceBooks #Textbooks #Exams #Qualifications #Guides #Books #CD・DVD
1 week ago