(JP¥1,600)
+NT$386 Shipping fee
+NT$64 Agent service fee
Text are automatically translated.
Report translation issueText are automatically translated.
Report translation issueFraud prevention
Customer support
Refund support for customers
Seller info
na-chan*
5/5166
View detail
Item condition
Brand New
Ships from
Japan
Category
Something went wrong, please try again later.
This item can't be bundled due to shipping restrictions. Please buy separately.
Something went wrong, please try again later.
This item can't be bundled due to shipping restrictions. Please buy separately.
The examples of construction experience descriptions for sale were created based on the types and contents of the construction I have actually experienced. Compared to commercially available reference books, the content is almost entirely unique. I have passed the Level 2 Electrical Construction Work Management Engineering Examination based on the content of ① below. For each question, I have prepared one (3 items) of countermeasures or actions for the points to note and their reasons. The specific details are as follows: Construction Content: Electrical Instrumentation Work ① Safety Management: Preventing workers from falling during cable rack installation Preventing falling objects during lifting operations Process Management: Preventing delays in our own processes due to delays in the previous process Preventing the occurrence of waiting periods due to a shortage of materials Construction Content: Explosion-proof lighting equipment installation work ② Safety Management: Preventing workers from falling during the installation of lighting fixtures Preventing tools from falling during the assembly of lighting fixtures Process Management: Preventing delays in the process due to delays in the delivery of lighting fixtures Preventing a decrease in efficiency during the transportation of materials and the removal of waste materials Construction Content: Emergency power generation equipment installation work ③ Safety Management: Preventing pedestrians from falling during wiring in the underground pit Preventing accidents caused by flying and falling welding sparks during welding Process Management: Preventing delays in the process due to a shortage of workers Preventing delays in the process due to competing work with other construction projects Specific information such as building names and addresses is left blank (fill in ●●●). The attached answer sheet is also enclosed, so please copy and use it. Upon purchase, I will enclose 8 A4 sheets (the above 3 examples of experience descriptions + answer sheet) in a clear file and ship them in an envelope. Please refrain from price negotiations m(_ _)m #Level 2 Electrical Construction Work Management Engineer #Level 2 Electrical #Electrical Construction #Construction Management #2nd Stage #Practical #Written #Description
10 months ago