(JP¥1,700)
+NT$386 Shipping fee
+NT$64 Agent service fee
Text are automatically translated.
Report translation issueText are automatically translated.
Report translation issueFraud prevention
Customer support
Refund support for customers
Seller info
na-chan*
5/5168
View detail
Item condition
Brand New
Ships from
Japan
Category
Something went wrong, please try again later.
This item can't be bundled due to shipping restrictions. Please buy separately.
Something went wrong, please try again later.
This item can't be bundled due to shipping restrictions. Please buy separately.
The examples of construction experience descriptions for sale were created based on the types and contents of the construction I have actually experienced. Compared to commercially available reference books, the content is almost entirely unique. I have passed the Grade 1 Electrical Construction Management Engineering Examination based on the content of ① below. The specific details are as follows: Construction Content: Electrical Instrumentation Work ① Fall Accidents: Preventing workers from falling during cable rack installation → 2 countermeasures for 1 reason Flying/Falling Objects: Preventing flying/falling of suspended loads during lifting operations → 2 countermeasures for 1 reason Electric Shock Accidents: Preventing workers from electric shock during work inside panels → 1 countermeasure (3 items) for 1 reason Process Management: Preventing delays in our own processes due to delays in previous processes → 2 countermeasures for 1 reason Preventing waiting periods due to lack of materials → 2 countermeasures for 1 reason Quality Control: Preventing malfunctions during operation of instrumentation equipment → 1 countermeasure (3 items) for 1 reason Construction Content: Explosion-Proof Lighting Equipment Installation ② Fall Accidents: Preventing workers from falling during the installation of lighting fixtures Flying/Falling Objects: Preventing flying/falling of tools during the assembly of lighting fixtures Electric Shock Accidents: Preventing workers from electric shock when using power tools Process Management: Preventing delays in the process due to delays in the delivery of lighting fixtures Preventing reduced efficiency during material delivery and waste disposal Quality Control: Preventing accidents due to poor performance of lighting fixtures Construction Content: Emergency Generator Equipment Installation ③ Fall Accidents: Preventing pedestrians from falling during wiring in the underground pit Flying/Falling Objects: Preventing flying/falling of welding sparks during welding Electric Shock Accidents: Preventing workers from electric shock during welding of steel frames Process Management: Preventing delays in the process due to a shortage of workers Preventing delays in the process due to competing work with other construction Quality Control: Preventing malfunctions during operation of power generation equipment Specific information such as building names and addresses is left blank (fill in ●●●). The attached answer sheet is also enclosed, so please copy and use it. Upon purchase, 12 A4 sheets (the above 3 examples of experience descriptions + answer sheet) will be placed in a clear file and shipped in an envelope. Please refrain from price negotiations m(_ _)m #Grade 1 Electrical Construction Management Engineer #Grade 1 Electrical #Electrical Construction #Construction Management #2nd Stage #Practical #Written #Description
5 months ago